Glossary - 'A'

  • Acceptance This is a response to a risk event, generally made when the probability of the event and/or its impact are small. It is used when mitigation, transference, or avoidance are not selected.
  • Active listening This occurs when the receiver confirms the message is being received. It can be done by way of feedback, questions, prompts for clarity, and other signs of having received the message.
  • Activity list An output of the activity definition process that includes all of the activities to be performed within the project.
  • Activity on arrow A network diagramming method where the arrows in the arrow diagramming method network diagram represent the activities within the project.
  • Activity on node A network diagramming method where the nodes in a project network diagram represent the activities.
  • Activity sequencing A process for setting the order of activities within the project schedule.
  • Actual cost (AC) Used in earned value measurements; the actual cost of the work performed.
  • Administrative closure The documenting of the project results and the acceptance of the product by the customer or the project sponsor. Administrative closure is also needed if a project is terminated.
  • Analogous estimating This relies on historical information to predict estimates for current projects. Analogous estimating is also known as top-down estimating and is a form of expert judgment.
  • Application areas These are the areas of business, industry, and trade about which the project manager may need special knowledge. Common application areas include legal issues, technical issues, engineering information, and manufacturing information.
  • Assumptions Beliefs considered to be true, real, or certain for the sake of planning.
  • Avoidance This is one response to a risk event. The risk is avoided by planning a different technique to remove the risk from the project.

    _________
    References:

  • PMP Exam Prep, Fifth Edition: Rita's Course in a Book for Passing the PMP Exam by Rita Mulcahy.
  • PMP Project Management Professional Study Guide, Second Edition by Joseph Phillips.
  • PMP: Project Management Professional Study Guide, 3rd Edition by Kim Heldman.